Complex detailing and a demanding programme were amongst some of the challenges faced by main contractor ISG Pearce during the recent refurbishment of Building 5 West Lecture Theatres at the University of Bath.
As their appointed subcontractor, in-house CAD design facilities and an extensive product range enabled Techniglaze to successfully combine high performance CWCT Approved Curtain Walling system with bespoke Insulated Aluminium Pressings, Polyamide Thermally Broken Casements, High Usage Entrance Doors and Thermally Broken Sloping Glazing to provide the contractor with a complete solution.
Incorporating Self-Cleaning and Solar Control Glazing, the installation was completed on time and represents a significant part of the overall investment by the University in bringing the Lecture Theatre facilities up to modern standards.